SAJ's Milestone Project in Malaysia: Self-Consumption Excellence for Glass Factory—perfectly aligned with today's local energy policies and real industrial needs.
.jpg?width=1200&height=618&name=1.1(1).jpg)
Alor Setar, Malaysia Factory January, 2026
SAJ 4*110kW C6 String Inverter + 2*261kWh CM2 All-in-One ESS
Project Setup
• 4 × 110kW C6 String Inverters
• 2 × 261kWh CM2 All-in-One ESS (Liquid Cooling)
• AC-coupled system + smart EMS
What makes this project special:
• Cuts demand charges through peak shaving
• Maximizes PV self-consumption—no wasted solar
• Enables TOU arbitrage where applicable
• Provides reliable backup during grid outages
• Avoids costly transformer upgrades as loads grow
• Supports green certification and ESG incentives
With EMS as the smart brain, PV and storage are controlled precisely, fast, and simultaneously, delivering true energy efficiency and compliance.
A powerful example of how SAJ is redefining C&I energy storage in Malaysia.